redstand
Free tool

How many builders does your stand need?

Choose the size, system and days available. We estimate the crew and working days, and show the network builders who work with that system.

In short

Builders needed = (stand area ÷ m² per builder per day for the system) ÷ build days, with a minimum of two. Modular systems go up much faster per day than custom joinery.

60 m²
System
Days available to build
Builders2
Total working days2

See builders for this system

Rough estimate using reference rates (m² per builder per day). Each builder confirms the final crew.

Frequently asked questions

How is the number of builders calculated?

The stand area is divided by what one person builds in a working day with that system, and those working days are spread over the days available. Always with a minimum of two builders for safety.

Is it an exact calculation?

No. It is a rough estimate based on reference rates. The builder will confirm the final crew based on the actual design, heights and finishes.

Why does custom joinery need more people?

Because a joinery stand has to be assembled, painted and finished on site, while modular systems go up with prefabricated parts.

Got a trade show coming up?

Get a free quote from one or more network builders. They reply to you directly.